Role: As the electrical engineer (EEOR) for the new MarinHealth Hospital, led the design of the normal and emergency power systems.*
During the design worked closely with the design-build and facility team to ensure the project goals were met.
Markets | Hospital I-Occupancy |
Size | 254,000 sq ft, $534m |
Features | Design Build, BIM/VDC Delivery, ED, ICU, 114 private rooms |
Sustainability | LEED Silver |
Project Team | McCarthy Construction, Perkins Eastman, KPFF, Morrow Meadows, Mazzetti, Pan Pacific |